November 2008. FurnacePros provided on-site supervision of the critical move of a S-1210 furnace. The furnace required split into two section and special blocking to assure successful reassembly and startup at the new site. The furnace sections were then passed through a window and lowered to the ground floor. The entire operation was completed in 2 days.
Furnace sections passing through removed window on upper floor.
RTC S-1210 Furnace Assembled.