Container for sidebar
Corporate Offices
675 North Eckhoff St., Bldg D
Orange, Ca 92677 USA
September 2008. Upon sale by GreenBridge Technology of a GBT prototype S-615X furnace, FurnacePros was asked to bring the furnace up to like new condition for a production furnace. This effort included a thorough investigation of the furnace and subsequent configuration of the furnace software, replacement of certain parts, correction of all defects. The customer was present for the factory acceptance testing (FAT) in Orange, California and to witness operation of the equipment at near 1000 degrees C. The furnace was shipped to Taiwan for use in a solar cell production line. ev02
Inspection and 1000°C testing of S-615X furnace
GreenBridge S-615 furnace prepared for move to export crating